
Here our company Afghan Toll was the sub contractor of SNC Lavalin Canada.We were involved with this work from January 2007 while our actual contract period with SNC Lavalin was from 20 April 2008 to 20 June 2008.During this period we completed the entire 650 Km survey from Bandar Sher Khan on Tajikistan border till Torkham on Afghan Pak border.
We worked with SNC Lavalin team led by Mr willy Koituga and Dr Ahsan Akhtar,Dr Greg Weary AND Engineer Shiraz Satchu.
Our report was accepted by SNC Lavalin in August 2008 to their satisfaction.